Minimum Version Required: 25.01
Pre-Conditions
DSDLink Integration: Active account for customer order submissions.
Routing Configuration: Exchange Configuration set to Routing Method 2: Next Scheduled Delivery Event Then Stop.
Cut-off Times: Defined "Order Cut-Off Times" in Route Types (e.g., 4:00 PM).
Permissions: User access to the Import Conflicts dashboard and Invoice Audit records.
Steps
Identify the Conflict: Navigate to the Import Conflicts dashboard and locate the invoice.
Verify the Submission Timestamp: Open the Invoice Audit. Compare the "Date Added" against your Route Type cut-off time.
Check Load Sheet Status: Check the Field Audit for the intended delivery date. If the Load Sheet was "Locked for Routing" (by a user or
Auto_Lock_LoadSheets) before the invoice arrived, the "Push" logic was triggered.
Review the PO Date: Check the raw 850 file for the PODate. The dashboard often displays this requested date, even if the system attempted to find a different stop based on routing rules.
Contact Support if Unresolved: If the target date does not align with the customer's schedule, contact support with the following:
Invoice Audit ID and Customer ID.
Exact Error Message (e.g., "Problem 5: Order cut-off time passed").
Timestamp of order submission vs. your system's cut-off.
Exchange Task ID.
Fields And Definitions
In an Exchange Configuration using Routing Method 2, the software validates the order date against your routing schedule and warehouse status.
How the Logic Works
The Start Point: Regardless of the date the customer selects in DSDLink (
PODate), the system resets its search starting point to Today + 1 (tomorrow).
The Cut-off/Lock Check: The system checks the Route Type cutoff and the Load Sheet status. If the invoice arrives after the cutoff (e.g., 4:01 PM) or the Load Sheet is Locked for Routing, that date is skipped.
The Push: The system jumps to the next scheduled stop in the customer's record. This is why an order for "tomorrow" may show a date for "next week" if it was submitted just minutes after the load sheet locked.
Routing Method 2: Logic that finds the next valid delivery date based on the customer’s assigned stop schedule, starting from Today + 1.
Locked for Routing: Status of a Load Sheet meaning that no additional edits can be made while picking and routing is in process. No further invoices can be added without manually unlocking it.
Import Conflict: A holding area for invoices that cannot be placed on a Load Sheet due to errors or missed cut-offs.
PODate: The specific delivery date requested by the customer in the DSDLink interface.
Best Practices
Align Lock Times: Coordinate your
Auto_Lock_LoadSheetsschedule with your order cut-off times.
Monitor Post-Cutoff: Review the Import Conflicts dashboard daily shortly after the cut-off time to manually move orders that missed the window.
Communicate with Users: Ensure DSDLink users know that even a one-minute delay past the cutoff will push their order to the next scheduled delivery.