Minimum Version Required: 22.01
Pre-Conditions
Introduction
This document explains how route phasing works in Encompass and provides troubleshooting steps for issues where stops are included in a route when they should not be, due to perceived phasing errors.
Understanding Route Phasing
Delivery Date Phasing:
In Encompass, "Stops.Phase" always refers to the Delivery Date Phase.
Phasing operates on a rolling 4-week cycle, determined by the "Date Conversions" table.
The phase assigned to a stop is based on its delivery date, not the presell date.
Presell and Delivery Dates:
The presell date determines when a salesperson can create an order.
The delivery date determines which phase the stop falls into.
The system uses business day calculations to determine the delivery date based on the presell date and the lead time (e.g., 2-day or 3-day presell).
Date Conversions Table:
The "Date Conversions" table is the definitive source for determining which phase a specific date falls under.
Steps
Troubleshooting Steps
1. Verify Presell and Delivery Dates:
Confirm the presell and delivery dates for the stops in question.
Ensure that the lead time (presell days) is correctly calculated using business day calculations.
2. Check the Date Conversions Table:
Use the "Date Conversions" table to determine which phase the delivery date falls under.
This will confirm if the system is correctly assigning the phase.
3. Addressing Misunderstandings:
Clarify Phasing Concept: Phasing is based on a rolling 4-week cycle determined by delivery dates.
Explain Business Day Calculations: All deliveries must fall on a day that is set to is business day = true on the date conversions table. If a day is set to is business day = false, the system will skip that day.
4. Provide Information to Support:
When reporting a phasing issue, provide the following:
Route number.
Stop IDs.
Presell dates.
Delivery dates.
Screen shots of the date conversion table if possible.
Fields And Definitions
Example Scenario:
Scenario: A stop with a 2-day presell has a presell date of 3/5/2025.
Delivery Date Calculation: The delivery date is calculated as 3/7/2025 (2 days after 3/5/2025).
Phase Determination: Check the "Date Conversions" table for 3/7/2025. If 3/7/2025 falls into Phase 2, the stop will be assigned to Phase 2.
3 day presell example: If a stop has a 3 day presell, then the delivery date is calculated using business day calculations. So if the presell date is 3/5/2025, then the delivery date would be 3/10/2025.
Best Practices
Important Notes
Always refer to the "Date Conversions" table to confirm phase assignments.
Understand that presell and delivery dates are distinct and serve different purposes.
Business day calculations will effect the delivery date.
If you are unsure of any of these steps, please contact Encompass support.