Reopen a Packaging Production Order to correct Completed Units or Production Component Loss

Producer steps in Encompass for reopening a completed packaging production order to correct completed units and re-enter production component loss. Requires v22.10+.

B
Written by Bailey Naas-Thornton

Minimum Version Required: 22.10

Steps

Reopen a Packaging Production Order to correct Completed Units or Production Component Loss

Note: Any Production Component loss that was originally recorded when the packaging Production Order was completed is zeroed out when reopening the Production Order. You can re-enter loss when re-completing the order.
​
​
​

  1. After reopening the Production Order by clicking ‘Undo Completed’ on the Production Order Edit page, click ‘Save Changes’.
    ​
    ​

  2. From the Production Processing page, click ‘Correct’
    ​
    ​

  3. Enter a corrected quantity value that is less than the original quantity.
    ​
    ​

  4. Click ‘Save’
    ​
    ​

  5. Production Component consumption is adjusted to match the new quantity
    ​
    ​

  6. Click ‘Complete’ to re-complete the Production Order
    ​
    ​

  7. Select ‘Yes’ to enter Production Component loss if the original order contained loss
    ​
    ​

  8. Enter Production Component loss quantity, and select your desired write-off method.