Minimum Version Required: 22.10
Steps
Reopen upstream Production Stages to correct Production Component batch assignments
Why:This data correction may be needed to retain accurate batch tracing or product costing.
1. From a reopened Production Order, click ‘Save Changes'
2. Click the ‘Undo’ option next to the stage status to revert back to the previous status
3. Reverting a stage back to its previous status has the following effects:
NOTE: There are additional Production Stage statuses not covered here when staging materials.
Reverting to In Process from Completed - Removes the stage’s Completed Units. Retains Production Components batch assignment, but allows the updating of batch assignment.
Reverting to New from In Process - Un-assigns Production Components and puts Production Components back into inventory.
Best Practices
Production Stages must be reopened in reverse sequential order due to the downstream impact of Production Component consumption.